Affiliates










Become an Affiliate

Site Meter

Kingda Ka Construction > Construction Update

Report by Barry Gessner, Great Adventure Source contributor
Photos taken August 17, 2004

Footers are clearly marked throughout the season pass parking lot. Holes have been dug out for some of the brake run footers and steel support placed in those holes. They seem to be trying to get things ready quickly in preparation for the concrete. The mystery "footer" between the obvious brake and launch runs is indeed a footer with steel rebar right next to it. More track arrived today although its very odd that none of the launching equipment (ie the rollback brakes) are installed yet. TTD launch came with everything already assembled. The tower footer also seems just about completely dug out as they have placed what looks to be cooling piping in the bottom of the hole.

Click on thumbnail for full size. Images are property of Great Adventure Source.

 

East Coasters Network:
ECN Home | Amusement Pics.com | Northeast Coasters | PKD Place | SFNE Online | SFOGnet

Copyright © 2000-2005 Great Adventure Source.