Footers are clearly marked throughout the season
pass parking lot. Holes have been dug out for some of the brake
run footers and steel support placed in those holes. They seem
to be trying to get things ready quickly in preparation for the
concrete. The mystery "footer" between the obvious brake
and launch runs is indeed a footer with steel rebar right next
to it. More track arrived today although its very odd that none
of the launching equipment (ie the rollback brakes) are installed
yet. TTD launch came with everything already assembled. The tower
footer also seems just about completely dug out as they have placed
what looks to be cooling piping in the bottom of the hole.
Click on thumbnail for full size. Images are property of Great
Adventure Source.