Affiliates










Become an Affiliate

Site Meter

Kingda Ka Construction > Aerial Construction Update

February 18, 2005
Photos taken February 13, 2005
Approx. Height: 900-1,100 feet

Well, here we go again….Another look at what GA’s construction crew has done over the past week, only this time in more detail. As you can see, Viper is still in tact and shows no signs of being dismantled. GASM “looks” like it has been painted, though this could be the sun and clear air giving it that effect. The Chiller doesn’t look painted, but I really never paid much attention to this ride before so I can’t tell for sure.

As far as our NEW attraction goes, KK’s station is coming along nicely, but still needs much work before accepting riders, and there is still a section of track missing between the station and the launch portion. GK’s Tiger Arena is now adding a roof over the bleachers, and it looks as if the “Flats” all have a home, with many concrete disks present. There was one halfway decent picture that I captured (though not perfect by any means) of the entire KK coaster.
- Philip Kineyko

Click on thumbnail for full size. Images are property of Great Adventure Source.

 

East Coasters Network:
ECN Home | Amusement Pics.com | Northeast Coasters | PKD Place | SFNE Online | SFOGnet

Copyright © 2000-2005 Great Adventure Source.